Construction site intelligence

Know your site.
Keep work moving.

Connect people, machinery, materials and site events in one operational view. Help teams work safely, coordinate resources and keep a traceable record of what happened.

North bridge / Camera 04 + RTLSView full-size image
Bridge construction camera view with a mobile crane CRN-04, delivery truck TRK-02, a marked crane operating zone, and personnel and tower-crane markers. Foreground roles: steel fixer, tag P-284; site supervisor, tag P-637. A suspended load is annotated 4,180 kg.P-418P-735P-590P-821P-964P-356P-608P-966P-752P-273M-014,180 kg

Mobile crane CRN-04 · Delivery truck TRK-02 · Steel fixer P-284 · Site supervisor P-637. Roles and identities come from tag assignments.

North bridge project · Camera 04 · 16 September 2026Site visibility → operational action → traceable evidence

01 / What changes for your team

A clearer site picture.
A more useful working day.

01 / SAFETY

Help teams work more safely.

Bring people, machinery, proximity events and risk zones into one shared view. Give the team context to respond and learn.

02 / COORDINATION

Keep work moving.

Find resources, understand equipment use and identify delivery conflicts before they hold up the next work front.

03 / EVIDENCE

Keep a record you can stand behind.

Connect site events, images, material records and decisions into a traceable history for reviews and handover.

02 / Connected site view

Know where your people,
assets and machinery are.

Locate tagged personnel, tools and equipment in the context of your work fronts. The RTLS view brings positions, recent movement and last-seen information onto one site map.

NORTH BRIDGE / LOCATION WORKSPACE

A shared view of the site.

Personnel, assets and machinery on a shared site mapRTLS map: personnel tags P-284 and P-637 in zone B, crane M-04 at the access road, loader M-09 near the entrance, tools A-03 in storage and generator A-12 with a stale last-known position. Distinct shapes identify each type.STORAGE / ZONE ADECK / ZONE BCRANE ACCESSSITE ENTRANCEN ↑SCHEMATIC · NOT TO SCALE P-284 P-637 A-03 · ToolsA-12 · GeneratorLast known · 4 min ago M-04 · CraneM-09 · Loader

Showing all 6 locations.

LOCATION REGISTER
P-284 · Personnel tag

Zone B · last seen 8 seconds ago

Shift-assigned tag · no name shown
P-637 · Personnel tag

Zone B · last seen 6 seconds ago

A-03 · Tool rack

Storage · last seen 12 seconds ago

A-12 · Generator

Last known position · 4 minutes ago

Stale location · check before relying on it
M-04 · Mobile crane

Access zone · last seen 5 seconds ago

M-09 · Loader

Site entrance · last seen 7 seconds ago

Dashed trail: recent movementDashed ring: proximity zone

Locate and coordinate

Find tagged resources, see which zone they occupy and understand how movements relate to deliveries and work fronts.

Make gaps visible

Show last-seen times and distinguish a current reading from a stale position. Coverage and accuracy depend on the validated site configuration.

Keep warnings local

Compatible equipment provides local proximity warnings independently of cloud or cameras. Warnings do not control machinery.

Explore sensors, camera context and local processing →

03 / Visibility becomes action

From a site event
to a useful next step.

Three connected workflows, shown through the North bridge project.

Safety and incident review

Reconstruct the event.
Understand the response.

A proximity event connects the people and machinery involved with location history, a camera frame and the team’s response. Review the sequence together and record the follow-up.

Follow an incident record →
NORTH BRIDGE · ZONE BINC-016

Proximity event · 16 Sep

  1. Location history

    P-284 approaches the CRN-04 proximity zone.

  2. Event + camera context

    Local warning recorded. Camera 04 frame linked for review.

  3. Response recorded

    Site supervisor acknowledges and requests an access check.

  4. Incident review

    HSE lead receives the linked sequence and follow-up task.

Review open · HSE lead

Equipment and coordination

See the constraint.
Prepare the next move.

CRN-04 is needed for tomorrow’s deck work. A steel delivery overlaps with its access window. Connect the conflict to the affected activity and propose a morning arrival for the procurement lead to review.

Combine equipment telemetry with location and work context to distinguish active time, idle periods and missing data.

CRN-04 · TAG M-0416 SEP

Equipment use, in context.

08:0012:0016:00

6 h active · 1 h idle · 1 h without telemetry
Activity classification uses equipment data, not a single camera frame.

Upcoming conflict
17 Sep · 13:00–16:00
Crane access / steel delivery
Affected work
Zone B · deck reinforcement
Proposed action
Request a morning delivery slot
DR-018 · Awaiting approval

Materials and evidence

Follow the material.
Keep its history attached.

Connect each delivery to the supplier, batch, receipt and associated work. Keep the delivery note, inspection and material certificate alongside the record so the next person can follow the same trail.

Explore material history →
NORTH BRIDGE · STEELDEL-024

12 t reinforcement steel

  1. SupplierSteel supplier S-08
  2. DeliveryDEL-024 · 17 Sep · 08:30
  3. BatchST-0917 · 12 t received
  4. ReceiptRCV-024 · 17 Sep · 08:45
  5. Associated workZone B · deck reinforcement
Delivery noteMaterial certificateReceipt photo

Receipt linked · work acceptance pending

Reporting and coordination

Know what happened.
Plan what comes next.

Daily reporting turns observations into a shared plan. Source-linked recommendations keep the reason for each proposed action close to the decision.

16:30
GroundOS FIELD
NORTH BRIDGE / ZONE B

Today’s observation

Activity
Deck reinforcement
Site manager’s note

Reinforcement has reached bay 4. Check steel for the next work front. Crane access needed tomorrow afternoon.

Reported progress68%
Observation submitted for review

Mobile field reporting

  1. 01

    Capture.

    Record the site observation, activity and reported progress from the field.

  2. 02

    Understand.

    Connect the update to the work ahead. See the steel requirement and the crane-access conflict together.

  3. 03

    Act.

    Review a morning delivery proposal with its sources attached. Approve the next step and keep the decision.

Follow the complete workflow →

04 / Traceable evidence

The record stays useful
after the moment has passed.

Answer what happened, what changed and who reviewed it.

Bring incident history, material records, company and team activity, recorded work and approvals into one reviewable package. Export reporting with its source references for progress discussions and handover.

Tag presence provides activity context. Completed work is supported by recorded quantities, inspections and approvals.

Explore the evidence trail →

EVIDENCE PACKAGENB / ZONE B

One work front. Linked records.

North bridge · 16–17 September 2026

Incident history
INC-016 · location + frame + response
Decision
DR-018 · report #042 rev 1
Delivery plan v3 → v4
Material history
DEL-024 → ST-0917 → RCV-024
Company / team
Subcontractor SC-03 · steel team
Recorded work: deck reinforcement
Review state
Receipt linked · work acceptance pending
Sources · timestamps · revisions · approvals

05 / Fits the way you work

Connect the site
to the systems you use.

Bring field information into project discussions without asking every team to start again.

FIELD INPUTS

Sensors and observations

Tags, cameras, equipment data and mobile reporting.

GroundOS

Context and review

Relate events to work, prepare actions and preserve their history.

PROJECT SYSTEMS

Useful information, shared

Reports, planning records, material registers and asset information.

Choose the exchange formats and connections around your existing systems. Integration scope is agreed for each pilot.

See how the platform fits →

06 / A wider product vision

Useful today.
Valuable across the lifecycle.

Understand the site → coordinate the work → preserve its history → support the asset throughout its lifecycle.

  1. 01 / UNDERSTAND

    See the physical site.

    Connect people, machinery and materials to the work around them.

  2. 02 / COORDINATE

    Close the resource gap.

    Turn constraints into reviewed actions and better prepared work fronts.

  3. 03 / PRESERVE

    Carry the record forward.

    Build digital handover around material history, execution records and warranties.

  4. 04 / SUPPORT

    Keep the asset understood.

    Extend the vision into maintenance and operational digital twins.

Resource network / Partner invitation

When a resource is missing,
help the right capacity find the site.

Our resource-network vision connects contractors with available equipment, machinery, operators and specialist crews. We’re inviting rental companies, equipment owners and construction teams to shape this direction with us.

Explore the resource-network vision →

07 / Build around your site

Bring us a site challenge.
Let’s build the pilot around it.

Equipment sitting idle. Difficult handovers. Missing delivery records. An incident that takes days to reconstruct. Tell us where your team loses time or visibility, and help shape a pilot around the outcome that matters most.

Plan a pilot with us
  1. 01

    Choose the outcome

    Safer site coordination, better equipment use or a clearer evidence trail.

  2. 02

    Understand the site and data

    Available documents, systems, connectivity, access and any relevant equipment.

  3. 03

    Agree what success means

    Define a baseline, review responsibilities and measures to assess the pilot.